RU | EN
      1. 3.2.1 Network Exploitation and Grid Asset Consolidation
      2. 3.2.2 Development of the Grid Complex
      3. 3.2.3 Connection
      4. 3.2.4 Electricity Transmission
      5. 3.2.5 Additional (non-tariff) services
      6. 3.2.6 Consumer liaison
      7. 3.2.7 Key RAS metrics
      8. 3.2.8 Key IFRS metrics
      9. 3.2.9 Tariff Policy
      10. 3.2.10 Investments
      11. 3.2.11 Innovations
      12. 3.2.12 Progress of the Digital Transformation Program

For the operation of the site, we collect cookies, information about the IP address and location of users. If you do not want this data to be processed, please leave the site.

3.2.2 Development of the Grid Complex

The electricity sector of the areas of the Company’s presence evolves in line with the relevant regional schemes for development of the energy complex, generated in compliance with the Government Decree[17], with due consideration of the development plans of all subjects of the energy system and capacity demand forecasts.

In 2021, the authorities of the Perm, Sverdlovsk and Chelyabinsk regions have prepared and approved the schemes and blueprints for development of the energy sector for 2022-2026[18-20].

In an effort to optimize plans on development of the grid sector, in 2021 OAOOpen Joint-Stock Company IDGCInterregional Distribution Grid Company of Urals contracted AOJoint-Stock Company Federal Testing Center to prepare the Integrated 35+ kVkilovolt Network Development Program for 2022-2026. The Program’s materials, incl. baseline data on existing capacity utilization and proposals on its increase, as well as proposals on Company’s nominees to be included into the working groups, dealing with crafting of the schemes and blueprints for development of the energy sector for the next period, have been filed with the regional authorities to be used in the production of the schemes and programs for development of the energy complex for the next period, serving as a basis for the Company’s investment programs.